Sr No | Petition No/year | Petitioners | Respondents | Subject | Section | Date of Order | Attachments |
---|---|---|---|---|---|---|---|
1 | 1/2020 |
1) Hindalco Industries Limited |
1) M.P. Urja Vikas Nigam Limited |
In the matter of petition seeking permission to purchase additional non-solar Renewable Energy Certificate (RECs) due to non-availability of solar RECs in the State of M.P. in particular at factory/ unit – Mahan Aluminum, Bargawan District Singrauli for the purpose of fulfillment of renewable purchase obligation norms for solar RECs | Not Applicable | 03-May-2021 |
|
2 | 2/2020 |
1) M P Power Generating Company Limited |
1) Managing Director, MP Power Management Company Limited 2) M P Power Transmission Company Limited 3) Rajasthan Rajya Vidyut Prasaran Nigam Ltd., Jaipur 4) Uttar Pradesh Power Corporation Ltd., Lucknow |
True-up of Generation Tariff of MPPGCL’s Thermal and Hydro Power Stations for FY 2018-19 determined by MP Electricity Regulatory Commission vide Multi-Year Tariff order dated 14th July’ 2016 in Petition No. 08 of 2016. | Section 62 of the Electricity Act, 2003,Sections 64 of the Electricity Act 2003 | 29-Apr-2021 |
|
3 | 3/2020 |
1) Pithampur Audhyogik Sangathan |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) 2) The Energy Department of MP |
In the matter of tariff petition for ARR & Tariff determination for FY 2019-20 filed by SEZ. | Not Applicable | 07-Feb-2020 |
|
4 | 4/2020 |
1) M/s Jaiprakash Power Venture Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) Madhya Pradesh Vidyut Mandal Abhiyanta Sangh Jabalpur 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of application under Regulation 52 of MPERC (Terms and Conditions for determination of generation Tariff) Regulations, 2015 r/w Section 62 & section 86(1) of the Electricity Act, 2003 to direct MPPMCL to reimburse the filling and publication charges incurred by the petitioner during the true-up proceedings for FY 2016-17 ub P.No.57 of 2017 and true-up proceedings for FY 2017-18 in P.No.49 of 2018 of 2x250 MW (Phase-I) Coal based power project at Bina, Dist. Sagar due to additional capital expenditure incurred by the petitioner during FY 2016-17 and 2017-18. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 28-Jan-2020 |
|
5 | 5/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s Arya Energy Limited, Raipur |
In the matter of petition under Section 86(1)(b) and 86(1)(f) of the Electricity Act, 2003, read alongwith Hon’ble Supreme Court order dated 02.12.2019 passed in CA 8860/2019. | Section 86 of the Electricity Act, 2003 | 05-May-2021 |
|
6 | 6/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s. Orient Green Power Co. Ltd. |
In the matter of petition for approval of first amendment to PPA to be executed with the Respondent under Section 86(1)(b) of the Electricity Act, 2003 and MPERC (Power Purchase and Procurement Process) Regulations, 2004 Revision-1, 2006, read alongwith Hon’ble Supreme Court order dated 02.12.2019 passed in CA 8860/2019. | Section 86 of the Electricity Act, 2003 | 17-Dec-2020 |
|
7 | 7/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s Arya Energy Limited, Raipur |
In the matter of petition for approval of PPA to be execute with the Respondent under Section 86(1)(b) of the Electricity Act, 2003 and MPERC (Power Purchase and Procurement Process) Regulations, 2004 Revision-I, 2006, read alongwith Hon\\\'ble Supreme Court order 02.12.2019 passed in CA 8860/2019. | Section 86 of the Electricity Act, 2003 | 27-Jan-2020 |
|
8 | 8/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s Arya Energy Limited, Raipur 2) M/s. Orient Green Power Co. Ltd. |
In the matter of petition under Section 61, 62, 86(1)(b) of the Electricity Act 2003 read with MPERC (Terms and Conditions for tariff determination of renewable energy sources) Regulations. 2017 and Hon’ble APTEL’s order dated 26.08.2019 passed in Appeal No. 396/2018 and Hon’ble Supreme Court order dated 02.12.2019 passed in CA8860/2019. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003 | 28-Jan-2021 |
|
9 | 9/2020 |
1) M/s Roca Bathroom Products Pvt. Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of application under MPERC (Grid Connected Net Metering) Regulations 2015 notified on 23.10.2015 and its amendment dated 03.02.2017 for consideration of the prayer for directing the Respondent No.1 to allow full installed capacity of solar unit 950 KW connected to grid for power generation. | Not Applicable | 10-Jan-2021 |
|
10 | 10/2020 |
1) M/s. Walwhan Solar MP Ltd., 2) M/s. Tata Power Renewable Energy Ltd. |
1) SLDC State Load Dispatch Center |
In the matter of petition under Regulation 11, 12 and 13 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar Generating Stations) Regulations, 2018 | Not Applicable | 14-May-2021 |
|
11 | 11/2020 |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
1) West Central Railways, Jabalpur 2) M P Power Transmission Company Limited 3) SLDC State Load Dispatch Center |
In the matter of petition filed under Section 42 read with Section 33(4), 86(1)(a), 86(1)(c), 86(1)(f) & 86(1)(k) of the Electricity Act, 2003, Clauses 18.15, 18.16, 18.18, 18.19 & 18.20 of MPERC (Terms & Conditions Intra-State Open Access in Madhya Pradesh) Regulation, 2005 and all other provisions enabling in that behalf, for direction to Indian Railway to make payment of open access charges on energy drawn through open access. | Section 86 of the Electricity Act, 2003,Section 33 of the Electricity Act, 2003 | 05-May-2021 |
|
12 | 12/2020 |
1) UltraTech Cement Limited 2) M/s Amplus Sunshine Pvt. Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition under Section 86 (1) (f) read with Section 42 of the Electricity Act, 2003 and Rule 3 of the Electricity Rules, 2005 seeking directions against MPPaKVVCL qua its illegal and arbitrary levy of Additional Surcharge on UltraTech Cement Ltd’s 15 MWp DC (12.75 MWp AC) onsite Captive Solar Generating Plant. | Section 86 of the Electricity Act, 2003,Section 42 of the Electricity Act, 2003 | 14-May-2021 |
|
13 | 13/2020 |
1) M/s. Orange Bercha Wind Power Pvt. Ltd. |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of application under Section 86(1)(f) of the Electricity Act, 2003, Regulation 10 of MPERC (Cogeneration and Generation of Electricity from Renewable Energy Sources) (Revision-I) Regulations, 2010, Section 94(2) of the Electricity Act, 2003, MPERC (Conduct of Business) Regulations and read with Article 7.2.1 of the PPA dated 10.02.2017, seeking directions to the Non-applicants to discontinue the illegal and arbitrary levy of tariff charges applicable to HV 3.1 category upon the applicant. | Section 86 of the Electricity Act, 2003 | 05-Jan-2021 |
|
14 | 14/2020 |
1) M/s. DJ Energy Pvt. Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) Managing Director, MP Power Management Company Limited |
In the matter of petition u/s. 86(1)(f) read with Section 45 of the Electricity Act, 2003, Regulation 10 of MPERC (Cogeneration and Generation of Electricity from Renewable Energy Sources) (Revision-I) Regulations, 2010 and Regulation 8.1.2 of the MPERC (Recovery of Expenses and Other Charges for providing electric line or plant used for the purpose of giving supply) Regulations, 2006 for directions to Respondents to bill the power drawn by the petitioner only under HV-7 category tariff. | Section 86 of the Electricity Act, 2003,Section 45 of the Electricity Act, 2003 | 18-Dec-2020 |
|
15 | 15/2020 |
1) Managing Director, MP Power Management Company Limited |
1) Ministry of New & Renewable Energy 2) M.P. Urja Vikas Nigam Limited |
In the matter of seeking amendment in MPERC (Cogeneration and Generation of Electricity from Renewable Energy Sources) (Revision-I) Regulations, 2010 by indicating RPO trajectory for the State of MP for the succeeding five years i.e. from FY 2022-23 to FY 2026-27. | Section 86 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003 | 22-Jan-2021 |
|
16 | 16/2020 |
1) M/s. Ostro Madhya Wind Pvt. Ltd., |
1) M P Power Transmission Company Limited 2) SLDC State Load Dispatch Center |
In the matter of petition under Section 86 of the Electricity Act, 2003 read with Regulation 6(5), 10 and 12 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar generating stations) Regulations, 2018 and Regulation 46 of the MPERC (Conduct of Business) Regulations, 2004 seeking exercise of power to issue directions to remove difficulty in implementation of the DSM Regulations. | Section 86 of the Electricity Act, 2003 | 14-May-2021 |
|
17 | 17/2020 |
1) M/s Maral Overseas Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) SLDC State Load Dispatch Center |
In the matter of filing of representation /appeal under clause 12 of Balancing and the settlement code, 2009 in pursuance to the directions issued by the Hon’ble Court of Madhya Pradesh , Bench at Indore vide its order dated 16.01.2020 passed in WP no. 5174/2015. | Not Applicable | 07-Dec-2021 |
|
18 | 18/2020 |
1) MP State Tourism Board , Bhopal |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited 2) Col. Subodh Shukla 3) Smt. NeeruGalhotra 4) MP Pashchim Kshetra Vidyut Vitran Company Limited 5) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of filling of petition to change the tariff rate of registered Homestay from commercial to residential and to waive of amount levied on the registered Homestay vide notice dated 18.02.2019 (P.No. 18/2020) | Not Applicable | 21-Dec-2020 |
|
19 | 19/2020 |
1) Prism Johnson Limited |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) SLDC State Load Dispatch Center 3) Ujaas Energy Limited 4) SKP Bearing Industries 5) Seattle Power Solutions Private Limited 6) JK Minerals 7) Ankit Gems Private Limited 8) Atul Sharma |
In the matter of petition under Regulation 18.9 of the MPERC (Terms and Conditions for Intra State Open Access in MP) Regulations, 2005 and in terms of the Order and Judgment dated 20.09.2019 passed by the Hon’ble High Court of MP in WP No. 3834 of 2019. | Not Applicable | 18-Dec-2020 |
|
20 | 20/2020 |
1) M/s. Walwhan Solar MP Ltd., |
1) Managing Director, MP Power Management Company Limited 2) SLDC State Load Dispatch Center 3) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition under Section 86(1)(e) of the Electricity Act, 2003 read with Regulation 16.17 read with 18.1 of the MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 seeking relaxation on the tariff applicable for auxiliary consumption by Solar Power Generators. | Section 86 of the Electricity Act, 2003 | 10-May-2021 |
|
21 | 21/2020 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff for Unit No. 1 of 2 x 600 MW sub-critical coal based Thermal Power Project at District Anuppur (M.P.) determined by MP Electricity Regulatory Commission for FY 2018-19 vide Order dated 1st December’ 2017. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 08-Feb-2021 |
|
22 | 22/2020 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff of Unit No. 2 of 2 x 600 MW sub-critical coal based Thermal Power Project at District Anuppur (M.P.) determined by MP Electricity Regulatory Commission for FY 2018-19 vide Order dated 29th November’ 2018. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 10-Feb-2021 |
|
23 | 23/2020 |
1) M/s. DJ Energy Pvt. Ltd. 2) M/s. Uttar Urja Projects Pvt. Ltd. |
1) SLDC State Load Dispatch Center 2) RE Connect Energy Solutions Private Limited, Indore |
In the matter of petition under Section 86 of the Electricity Act, 2003 r/w Regulation 11 (Power to Relax) and Regulation 12 (Power to issue directions) of the MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar generating stations) Regulations, 2018 and Regulation 46 of the MPERC (Conduct of Business) Regulations, 2004 seeking exercise of power to issue directions to remove difficulty in implementation of the Deviation Settlement Mechanism. | Section 86 of the Electricity Act, 2003 | 14-May-2021 |
|
24 | 24/2020 |
1) M/s Globus Steel and Power Pvt Ltd. |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86 of the Electricity Act, 2003 read with Clause12.03 of PPA dated 16.06.2014. | Section 86 of the Electricity Act, 2003 | 16-Dec-2020 |
|
25 | 25/2020 |
1) Managing Director, MP Power Management Company Limited |
1) Managing Director, MP Power Management Company Limited 2) M P Power Transmission Company Limited |
Determination of the Final Generation Tariff for Unit No. 3 & 4 of 2x660 MW, Shri Singaji Thermal Power project (SSTPP) Stage II, from CoD of Unit No. 3&4 to 31st March’ 2019 under Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015. | Section 62 of the Electricity Act, 2003 | 18-May-2021 |
|
26 | 26/2020 |
1) SUO MOTO PETITON by MPERC |
1) Ministry of New & Renewable Energy 2) Managing Director, MP Power Management Company Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited 5) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of determination of tariff for procurement of power from Bagasse based cogeneration plants. | Not Applicable | 18-Dec-2020 |
|
27 | 27/2020 |
1) M/s Jhabua Power Limited |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff for 1x600 MW Unit (Phase-1) Coal Based Thermal Power Project at Barela-Gorakhpur, Dist. Seoni, (M.P.) determined by Madhya Pradesh Electricity Regulatory Commission for FY 2018-19 vide Order dated 30th November’ 2018 in Petition No 28 of 2018 and revised vide Order dated 27th December’ 2019 in Review Petition No 12 of 2019. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 05-Jan-2021 |
|
28 | 28/2020 |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1) and 63 of the Electricity Act, 2003, for adoption of Tariff determined through transparent process of bidding for long term procurement of 1230 MW Electricity from Thermal Power Station of 1320 MW to be set up on Design, Build, Finance, Own and Operate (DBFOO) basis in accordance to MoP Guidelines issued on 5th March’ 2019. | Section 86 of the Electricity Act, 2003,Section 63 of the Electricity Act, 2003 | 26-May-2020 |
|
|
29 | 29/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s Jhabua Power Limited |
In the matter of petition under Section 86(1) (b) & (k) of the Electricity Act, 2003, read with MPERC (Conduct of Business) Regulations, 2004 seeking approval of Draft Supplementary Agreement to PPA executed between MPPMCL and Jhabua Power Ltd. on 5th January’ 2011 for procurement of 30% power generated from Jhabua Power Station District Seoni (M.P.). | Section 86 of the Electricity Act, 2003 | 02-Nov-2020 |
|
30 | 30/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s Jaiprakash Power Venture Ltd |
In the matter of petition under Section 86(1) (b) & (k) of the Electricity Act, 2003, read with MPERC (Conduct of Business) Regulations, 2004 seeking approval of Draft Supplementary Agreement to PPA executed between MPPMCL and JPVL on 5th January’ 2011 for procurement of 30% power generated from 2x660MW Nigrie STPP at Village Nigrie, Distt. Singrauli (M.P.). | Section 86 of the Electricity Act, 2003 | 07-Sep-2020 |
|
31 | 31/2020 |
1) Managing Director, MP Power Management Company Limited |
1) M/s Jaiprakash Power Venture Ltd |
In the matter of petition under Section 86(1) (b) & (k) of the Electricity Act, 2003, read with MPERC (Conduct of Business) Regulations, 2004 seeking approval of Draft Supplementary Agreement to PPA executed between MPPMCL and JPVL on 5th January’ 2011 for procurement of 65% power generated from 2x250MW Bina TPP at Distt. Sagar (M.P.). | Section 86 of the Electricity Act, 2003 | 07-Sep-2020 |
|
32 | 32,33,34,35,36,37,38/2020 |
1) Renew Power Private Ltd. 2) Renew Wind Energy (Rajasthan) Private Ltd. 3) Renew Wind Energy (MP-Two) Private Ltd. 4) M/s. Ostro Madhya Wind Pvt. Ltd., 5) Ostro Urja Wind Private Ltd. 6) Renew Wind Energy (AP3) Private Ltd., 7) Badoni Power Private Ltd. 8) Renew Wind Energy (Rajasthan-One) Private Ltd. 9) AVP InfraPower Private Ltd., |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1) (f) read with Section 45 of the Electricity Act, 2003, Regulation 10 of MPERC (Cogeneration and Generation of electricity from Renewable Energy Sources) (Revision-I) Regulations, 2010 and Regulation 8.1.2 of the MPERC (Recovery of Expenses and Other Charges for providing Electric Line or Plant used for the purpose of giving supply) Regulations, 2006 for directions to Respondents to bill the power drawn, by the Petitioner’s wind power plants, only under HV-7 category tariff. | Section 86 of the Electricity Act, 2003,Section 45 of the Electricity Act, 2003 | 18-Dec-2020 |
|
33 | 41/2020 |
1) Association of All Industries |
1) Energy Dept. GoMP 2) Managing Director, MP Power Management Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited 5) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of petition filed under Clause 11.10, 11.11, 11.14, 11.17, 11.18 and 11.19 of the M.P. Electricity Supply Code, 2013 read with Regulation 3 sub-clause (I) read with Schedule 1 Clause 14 sub-clause (E) of the MP (Fees, Fines and Charges) Regulations, 2005 for removal of difficulties and for invoking extra-ordinary powers of the Commission. | Not Applicable | 10-Feb-2021 |
|
34 | 42/2020 |
1) M P Power Transmission Company Limited |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited 5) M.P. Industrial Development Corporation Ltd. (MPIDC) 6) West Central Railways, Jabalpur |
MPPTCL’s petition for approval of Capital Investment Plan for Transmission works to coincide with control period of MYT (FY 2019-20 to FY 2023-24). | Not Applicable | 12-Mar-2021 |
TBCP Order passed on 15th January, 2021 |
35 | 43/2020 |
1) M/s Jaiprakash Power Venture Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
IN THE MATTER OF: Determination of Multi-Year Tariff for the 2X660 MW Super Critical Coal Based Thermal Power Station at Nigrie, District Singrauli, Madhya Pradesh for the control period of FY 2019-20 to FY 2023-24 under Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 03-May-2021 |
|
36 | 44/2020 |
1) M/s Jaiprakash Power Venture Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Determination of Multi-Year Tariff for 2x250MW (Phase-I) Coal Based Power Project at Bina, District Sagar, Madhya Pradesh for the control period of FY 2019-20 to FY 2023-24 under Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 30-Apr-2021 |
|
37 | 45/2020 |
1) M P Power Transmission Company Limited |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) M.P. Industrial Development Corporation Ltd. (MPIDC) 5) West Central Railways, Jabalpur |
MPPTCL’s petition for determination of Transmission Tariff for MYT control period from FY 2019-20 to FY 2023-24. | Not Applicable | 19-May-2021 |
|
38 | 46/2020 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Determination of Multi-Year Tariff for the 2x600 MW Coal Based Thermal Power Project at District Anuppur, Madhya Pradesh for the control period from FY 2019-20 to FY 2023-24 based on Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 01-May-2021 |
|
39 | 47/2020 |
1) M/s Jhabua Power Limited |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Determination of Multi-Year Tariff for 1 x 600 MW (Phase-I) Coal Based Power Project at Barela-Gorakhpur, Dist. Seoni, Madhya Pradesh for the control period of FY 2019-20 to FY 2023-24 under Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 08-May-2021 |
|
40 | 48/2020 |
1) M/s KRBL Limited, |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) Managing Director, MP Power Management Company Limited |
In the matter of petition filed under Section 86(1)(f) read with section 45 of the Electricity Act, 2003 and Regulation 10 of MPERC (Cogeneration and Generation of Electricity from renewable Energy Source) (Revision-I) Regulations, 2010 for directions to Respondents to bill the power drawn by the petitioner only under HV-7 category tariff. | Section 86 of the Electricity Act, 2003,Section 45 of the Electricity Act, 2003 | 28-Dec-2020 |
|
41 | 49/2020 |
1) Association of Industries, |
1) Energy Dept. GoMP 2) Managing Director, MP Power Management Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited 5) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of petition filed under clause 11.1, 11.2 (Force Majeure condition) and 11.10, 11.11. (Unforeseen Circumstances) 11.14, (Power to remove difficulties), 11.17, 11.8 and 11.19(Repeal and Savings) of the M.P. Electricity Supply Code, 2013. | Not Applicable | 10-Feb-2021 |
|
42 | 50/2020 |
1) M.P. Urja Vikas Nigam Limited |
1) Managing Director, MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited 5) Energy Dept. GoMP |
In the matter of petition for determination of Feed-in-Tariff for sale of power from decentralized solar power plants having capacity of 500 kW to 2MW to be set up under Component-A of the Pradhan Mantri Kisan Urja Surakhsha Evam Utthan Mahabhiyan (PM KUSUM) Scheme introduced by GoI. | Section 86 of the Electricity Act, 2003,Sections 61 of the Electricity Act 2003 | 16-Feb-2021 |
|
43 | 51/2020 |
1) Ratedi Wind Power Pvt. Ltd 2) Eresian Urja Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) Managing Director, MP Power Management Company Limited |
In the matter of petition filed under Section 86(1)(f) read with section 45 of the Electricity Act, 2003 and Regulation 10 of MPERC (Cogeneration and Generation of Electricity from renewable Energy Source of Energy) Regulations, 2010 for directions to Respondents to bill the power drawn by the petitioners only under HV-7 category tariff. | Section 45 of the Electricity Act, 2003 | 28-Dec-2020 |
|
44 | 52/2020 |
1) M/s. Shriniwas Board And Paper Pvt. Ltd 2) M/s. Shree Balaji Enterprises |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) Managing Director, MP Power Management Company Limited |
Petition under Rule 9 and 10 of the Madhya Pradesh Electricity Regulatory Commission (Rules of Business) Regulations, 2016 For Quashing and Setting aside of the Impugned letters dated 18-01-2020, 23-01-2020, 15-02-2020 and 06-06-2020 as issued by Respondent No.1 | Not Applicable | 22-Sep-2021 |
|
45 | 53/2020 |
1) M P Power Generating Company Limited |
1) Managing Director, MP Power Management Company Limited 2) M P Power Transmission Company Limited 3) Rajasthan Rajya Vidyut Prasaran Nigam Ltd., Jaipur 4) Uttar Pradesh Power Corporation Ltd., Lucknow 5) MSEB (Holding Co) & Maharashtra State Transmission Co. Ltd, Mumbai |
Determination of Multi Year Tariff (MYT) of MPPGCL’s Thermal and Hydel Power Stations for the control period of FY 2019-20 to FY 2023-24 under Section 62 and 86(1)(a) of the Electricity Act, 2003 based on the MPERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2020. | Section 62 of the Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 19-May-2021 |
|
46 | 54/2020 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
Determination of Aggregate Revenue Requirement and Tariff for the Financial Year 2020-21 based on application filed by the Madhya Pradesh Industrial Development Corporation (MPIDC), erstwhile MPAKVN(I)L, for Special Economic Zone (SEZ) at Pithampur Area, District Dhar, Madhya Pradesh. | Not Applicable | 12-May-2021 |
|
|
47 | 55/2020 |
1) M/s Venus Alloys Pvt. Ltd, Mandsaur |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of clarification of clause 1.7(iii) regarding payment & clause 1.7(f) for calculation of additional security deposit amount of MPERC(Security Deposit) Rev1 Regulations 2020 (RG-17(1) of 2019 (P.No. 55 /2020) | Not Applicable | 03-May-2021 |
|
48 | 56/2020 |
1) M/s. Orange Mamatkheda Wind (P) Ltd. |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of application under Section 86(1)(f) of the Electricity Act, 2003 read with Regulation 10 of the MPERC (Cogeneration and Generation of Electricity from Renewable Energy sources) (Revision-I) Regulations, 2010 read with Section 94(2) of the Electricity Act, 2003 read with MPERC (Conduct of Business) Regulations and Article 7.2.1 of the PPA dated 14.08.2014, seeking directions to the Respondents to discontinue the illegal and arbitrary levy of tariff charges applicable to HV 3.1 category upon the petitioner and application also for urgent hearing and also for seeking stay of the operation of impugned invoice dated 05.08.2020 issued by M.P. Paschim Kshetra Vidyut Vitaran Co. Ltd. and direction to discontinue levy of bills under HV 3.1 (Industrial) category of consumers. | Section 94 of Electricity Act, 2003,Section 86 of the Electricity Act, 2003 | 05-Jan-2021 |
|
49 | 57/2020 |
1) M/s Brilliant Estates |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition under Section 82 and 86 of the Electricity Act, 2003 read with Section 9 of the M.P.Vidyut Sudhar Adhiniyam, 2000 | Section 86 of the Electricity Act, 2003,Section 82 of the Electricity Act, 2003 | 01-Sep-2021 |
|
50 | 58/2020 |
1) M/s Ramnik power & Alloys pvt. Ltd. |
1) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of petition under section 62 of Electricity Act 2003 seeking clarification in Tariff order FY2019-20 under tariff schedule HV3.4 | Section 62 of the Electricity Act, 2003 | 03-Feb-2021 |
|
51 | 59/2020 |
1) M.P. Industrial Development Corporation Ltd. (MPIDC) |
1) Managing Director, MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) Energy Dept. GoMP 4) M P Power Transmission Company Limited |
In the matter of application filed by MPIDC Bhopal for grant of power distribution license for Industrial Area at Mohasa – Babai, Dist. Hoshangabad, MP under Sections 14 and 15 of the Electricity Act, 2003 and as per MPERC (Procedure of Application for License) Regulations, 2004. | Section 14 of the Electricity Act, 2003,Section 15 of the Electricity Act, 2003 | 10-May-2021 |
|
52 | 60/2020 |
1) M/s Lanco Amarkantak Power Pvt Ltd 2) M/s. PTC India Ltd. 3) Managing Director, MP Power Management Company Limited |
In the matter of Determination of Tariff for 1x300 MW (Unit No.1) Lanco Amarkantak Coal Based Thermal Power Plant at Pathadi village, Korba district, Chhattisgarh for FY 2014-15 to FY 2018-19 in accordance with applicable MPERC Generation TariffRegulations. | Sections 64 of the Electricity Act 2003 | 24-Aug-2021 |
|
|
53 | 61/2020 |
1) UltraTech Cement Limited |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition seeking directions against MPPaKVVCL qua its ex facie illegal and arbitrary levy of Additional Surcharge on the power consumed by UltraTech Cement Limited’s Dhar Cement Works from its onsite Captive Co-Generation Waste Heat Recovery System and Interlocutory Application seeking urgent listing and hearing of the petition. | Section 86 of the Electricity Act, 2003,Section 42 of the Electricity Act, 2003,Section 9 of the Electricity Act, 2003 | 14-May-2021 |
|
54 | 62/2020 |
1) UltraTech Cement Limited |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition seeking directions against MPPaKVVCL qua its ex facie illegal and arbitrary levy of Additional Surcharge on the power consumed by UltraTech Cement Limited’s Vikram Cement Works from its 2x23 MW onsite Captive Thermal Power Plant. | Section 86 of the Electricity Act, 2003,Section 42 of the Electricity Act, 2003,Section 9 of the Electricity Act, 2003 | 14-May-2021 |
|
55 | 63/2020 |
1) AMPL Cleantech (P) Ltd. |
1) M P Power Transmission Company Limited 2) SLDC State Load Dispatch Center |
In the matter of petition under Section 86 of the Electricity Act, 2003 read with Regulation 6(5), 10 and 12 of MPERC (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar generating stations) Regulations, 2018 and Regulation 46 of the MPERC (Conduct of Business) Regulations, 2004, seeking exercise of power to issue directions to remove difficulty in implementation of the Regulations. | Section 86 of the Electricity Act, 2003 | 14-May-2021 |
|
56 | 64/2020 |
1) M/s Grasim India ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition filed under section 86 (1) (F) of The Electricity Act, 2003, seeking directions against Madhya Pradesh Pashchim Kshetra Vidyut Vitaran Co. Ltd. qua its ex facie illegal and arbitrary levy of Additional Surcharge on the power consumed by Grasim Industries Ltd (Nagda)from its 65 MW onsite Captive Power Plant. | Section 86 of the Electricity Act, 2003 | 17-May-2021 |
|
57 | 65/2020 |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1)(b) of the Electricity Act, 2003 seeking approval for electricity purchase and procurement process including the price at which electricity is being procured from generating companies under the PSAs/PPAs mentioned under Para 6 of the petition. | Section 86 of the Electricity Act, 2003 | 27-May-2021 |
|
|
58 | 66/2020 |
1) Porwal Auto Components Pvt Ltd(Solar Division) |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of non-compliance of Retail Tariff Order by not allowing TOD rebate to the petitioner as per clause (b) Time of Day Surcharge / Rebate and clause (d) Rebate for incremental consumption for existing HT connections as specified in General Terms and Conditions of High Tension Tariff. | Not Applicable | 29-Jun-2021 |
|
59 | 67/2020 |
1) M/s Oil India Limited |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1)(f) of the Electricity Act, 2003 against MPPMCL for non-compliance of the terms of the PPAs dated 02.07.2015, 13.04.2018 and 07.01.2017 (supplementary PPA 20.07.2017) under Section 142 of the Electricity Act, 2003 for non-compliance of Tariff Order dated 26.03.2013 for procurement of power from Wind Electric Generators, and for non-compliance of Tariff Order dated 17.03.2016 for Procurement of Power from Wind Electric Generators and under Regulation 9(1) of the MPERC (Conduct of Business) Regulations, 2004. | Section 142 of the Electricity Act 2003,Section 86 of the Electricity Act, 2003 | 06-Oct-2021 |
|
60 | 68/2020 |
1) Association of All Industries |
1) Energy Dept. GoMP 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited 5) Managing Director, MP Power Management Company Limited |
In the matter of non-compliance of Retail Tariff Order by not allowing TOD rebate to the petitioner as per clause (b) Time of Day Surcharge / Rebate and clause (d) Rebate for incremental consumption for existing HT connections as specified in General Terms and Conditions of High Tension Tariff. | Not Applicable | 24-Aug-2021 |
|
61 | 69/2020 |
1) M/s Maral Overseas Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition under Clause 11.14 of the MPERC Electricity Supply Code, 2013 against illegal and arbitrary demand raised by the Respondent Electricity Company by levying an additional surcharge on the consumption of power from consumer’s own captive solar power plant vide demand letter dated 14.09.2020 & 16.10.2020 followed by bill dated 26.10.2020 & demand letter dated 21.11.2020. The impugned demand has been raised by the Respondents without any authority of law and in contravention of the Electricity Act, 2003. | Not Applicable | 27-Oct-2021 |
|
62 | 70/2020 |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
In the matter of filing of True up petition for FY2019-20 | Not Applicable | 12-Oct-2021 |
|
Copyright © 2024 - MPERC.
Contents Provided, Updated & Maintained By
MPERC, Bhopal (M.P.)
Disclaimer : While every care has been taken to ensure the accuracy of information furnished in this website, MPERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of this information. However, MPERC shall be obliged if errors/omissions are brought to its notice for carrying out corrections in the next update.