Sr No | Petition No/year | Petitioners | Respondents | Subject | Section | Date of Order | Attachments |
---|---|---|---|---|---|---|---|
1 | 1/2018 |
1) M.P Audyogic Kendra Vikas Nigam (Indore) Ltd |
In the matter of filing of the Petition for ARR and Tariff determination for FY 2018-19 under tariff principles laid down in the "MPERC (Terms and Conditions for Determination of Tariff for Supply and wheeling of Electricity and Methods and principles for Fixation of Charges) Regulations, 2015" along with other guidelines and directions issued by the MPERC from time to time and under Part VII (Section 61 to 64) of EA, 2003 read with the relevant guidelines. | Not Applicable | 28-May-2018 |
|
|
2 | 2/2018 |
1) M P Power Generating Company Limited |
Trueup of Generation Tariff of Power Stations of MPPGCL for FY 2016-17 determined by MPERC vide Multi Year Tariff order date 14.07.2016. | Not Applicable | 24-Jul-2018 |
|
|
3 | 3/2018 |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) Managing Director, MP Power Management Company Limited |
IN THE MATTER OF: Determination of Aggregate Revenue Requirement (ARR) and Retail Supply Tariff for FY 2018-19 based on the ARR & Tariff Petition filed by the Distribution Licensees namely Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (East Discom), Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (West Discom), Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (Central Discom), and M.P. Power Management Company Limited (MPPMCL). | Not Applicable | 03-May-2018 |
|
|
4 | 4/2018 |
1) BLA Power Pvt. Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Petition for determination of MYT for FY 2016-17 to FY 18-19 of Unit -II (45 MW) (of Petitioner's Generating Station) for sale of contracted Capacity to MP PMCL, (both Capacity/Fixed Charge and Variable Charge/Cost). | Not Applicable | 13-Mar-2018 |
|
5 | 5/2018 |
1) M/s Oil India Limited |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited |
Petition under section 86(1) (a), (b), (e), (k) read with section 62 of the EA,2003 seeking directions against the Regulation No.1 to reinstall the already executed Power Purchase Agreements with Oil India Limited within the State in terms of Wind Energy Tariff Order passed by the MPERC. | Not Applicable | 01-May-2018 |
|
6 | 6/2018 |
1) Electricity Distribution Business of Special Economic Zone (SEZ) area |
True Up of ARR for FY 2010-11, FY 2011-12, FY 2012-13, FY 2013-14, FY 2014-15, FY 2015-16 and FY 2016-17 under the prevailing MPERC MYT Regulations, along with other guidelines and directions issued by the MPERC from time to time and under Part VII (Section 61 to Section 64) of the Electricity Act, 2003 read with the relevant Guidelines. | Not Applicable | 13-Jan-2020 |
|
|
7 | 7/2018 |
1) M/s Jaiprakash Power Venture Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Multi year tariff petition under section 62 and section 86(1)(a) of EA,2003 read with MPERC (Terms and Conditions for determination of Generation Tariff) Regulation, 2015 for determination of Generation Tariff under the MYT framework for the 2X660 MW super critical coal based Thermal Power Station at Nigrie, District Singrauli, MP for the control period from FY 2016-17 to 2018-19. | Not Applicable | 29-Nov-2018 |
|
8 | 8/2018 |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of filing petition by West Discom for approval of investment plan of Rs 3951.40 Crore for FY2016-17 to FY2019-20. | Not Applicable | 16-Apr-2021 |
|
|
9 | 9/2018 |
1) M/s. Renew Solar Energy (TN) Pvt. Ltd. |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1)(f) read with Section 86(1)(e) of the Electricity Act, 2003 and Section 7.01 of the Power Purchase Agreement dated 05.06.2014 for directions to MPPMCL to discontinue billing Petitioner for import of Power Supply under Regulation 10 of the MPERC (Cogeneration and Generation of Electricity from Renewable Sources of Energy) Regulations, 2010 and to instead net-off the imported power against exported power against exported power in terms of Section 7.01 of the PPA. | Not Applicable | 06-Dec-2018 |
|
10 | 10/2018 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Determination of the Final Generation Tariff for Unit No. 2 (600 MW) of 2 x 600 MW coal based Thermal Power Project at District Anuppur (M.P.) from its CoD to 31st March’ 2017 and for FY 2017-18 to FY 2018-19 under Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015. | Not Applicable | 29-Nov-2018 |
|
11 | 11/2018 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Petition under section 62 and section 86(1)(a) of EA,2003 for true up of Tariff of UNit-I(600 MW) of 2X600 Mw coal based Anuppur Thermal Power Project (Phase-I) comprising of Unit-I & Unit-II (of 600 each) at District Anuppur, MP for the period from 1st April 2016 to 31st March 2019 under MPERC (Terms and Conditions for determination of Generation Tariff) Regulations,2015. | Not Applicable | 06-Sep-2018 |
|
12 | 12/2018 |
1) M/s. Jabalpur MSW Pvt. Ltd. (JMPL) |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited 5) Jabalpur Municipal Council 6) SLDC State Load Dispatch Center |
Petition for approval of tariff for sale of power to the distribution Licensee fro, 11.5 MW MSW based waste to Energy (WTE) plant located at Jabalpur. | Not Applicable | 03-May-2018 |
|
13 | 13/2018 |
1) MP Vidyut Mandal Abhiyanta Sangh, (MPVMAS 2) MP Vidyut Mandal Pensioners Association |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited 5) M P Power Transmission Company Limited |
In the matter of filing of petition seeking appropriate orders of the Commission for non-compliance of directions issued by MPERC in Regulation 7.10 of (Transfer of funds to pension and Terminal Benefit Trust Fund) of Retail Supply Tariff order dated 31.03.2017. | Not Applicable | 11-May-2021 |
|
14 | 14/2018 |
1) Managing Director, MP Power Management Company Limited 2) SLDC State Load Dispatch Center 3) M P Power Generating Company Limited |
In the matter of revision in PAFM of MPPGCL’s Hydro Generating Stations by MPSLDC on the basis of CERC order dated 20.12.2016 in Petition no. 40/MP/2016. | Not Applicable | 02-Feb-2019 |
|
|
15 | 15/2018 |
1) M/s Spentex Industries Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition u/s u/s 86(1)(k) and Regulations 45(1) and 47 of the MPERC (Conduct of Business) (Revision-I) Regulations, 2016, seeking clarification of the tariff orders dated 24.05.2014, 17.04.2015 and 05.04.2016 issued by this Commission for distribution licensees of the state for FYs 2014-15 , 2015-16 and 2016-17 respectively. | Not Applicable | 18-May-2018 |
|
16 | 16/2018 |
1) The Madhya Pradesh Textile Mills Association |
1) Managing Director, MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition u/s. 86(1)(E) r/w Section 151 of the Code of Civil Procedure, 1908. | Not Applicable | 22-Oct-2018 |
|
17 | 17/2018 |
1) BLA Power Pvt. Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
IN THE MATTER OF Approval of final capital cost and Multi-Year Tariff of Unit No. 2 (45 MW) coal based power project at Village Niwari, Tehsil Gadarwara, District Narsinghpur (M.P) for FY 2016-17 to FY 2018-19. | Not Applicable | 25-Oct-2021 |
|
18 | 18/2018 |
1) SUO MOTO PETITON by MPERC |
Tariff Order for Procurement of power from Small Hydro Power Projects in Madhya Pradesh | Not Applicable | 01-Dec-2018 |
|
|
19 | 19/2018 |
1) M/s Spentex Industries Ltd. |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of direction for reduction in sanctioned contract demand from 7000 KVA to 5000 KVA at 132 KV pursuant to clause 11.14 of MP Electricity Supply Code, 2013. | Not Applicable | 07-Jun-2018 |
|
20 | 20/2018 |
1) M P Power Generating Company Limited |
1) Managing Director, MP Power Management Company Limited 2) M P Power Transmission Company Limited |
In the matter of petition seeking directives for relaxation and removal of difficulty under proviso 54 and 55 of MPERC Terms and Conditions for determination of Generation Tariff Regulations, 2015 {RG-26(III) of 2015} towards shortage of coal at Thermal Power Stations of MPPGCL. | Not Applicable | 09-Aug-2018 |
|
21 | 21/2018 |
1) SUO MOTO PETITON by MPERC |
1) Govt. of Madhya Pradesh, Energy Department 2) Managing Director, MP Power Management Company Limited 3) MP Poorva Kshetra Vidyut Vitran Company Limited 4) M P Power Transmission Company Limited 5) SLDC State Load Dispatch Center |
In the matter of issues raised by the East Discom on the action taken by SLDC. | Section 108 of the Electricity Act, 2003 | 29-Aug-2019 |
|
22 | 22/2018 |
1) M/s Hind Spinner; 2) M/s Ritspin Synthetics Ltd 3) M/s Wearit Global Ltd; 4) M/s Century Yarn 5) M/s Century Denim |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) SLDC State Load Dispatch Center |
Appeal/Applications under clause 12 of the Balancing and Settlement Code ,2009 in pursuance to the Directions issued by the Hon’ble High Court of Madhya Pradesh , Bench at Indore vide its Order 12.02.2018 passed in Writ Petition 2162 of 2015 (Century Denim V/s State of MP & others), Writ Petition 2159 of 2015 ( M/s Century yarn V/s State of MP & others) , Writ petition no. 2004/2015 of (M/s Ritspin Synthetics Ltd. V/s State of MP & others) ,Writ Petition 1173 of 2016 (Hind Spinner V/s State of MP & others) , Writ petition 2494 of 2015 (Wearit Global Ltd. V/s State of MP & Others. P.No 22/2018 (Hind Spinner V/s West Discom); P.No. 29/2018 (M/s Ritspin Synthetics Ltd V/s West Discom); P.No. 30/2018 (Wearit Global Ltd V/s West Discom); P.No. 40/2018 (M/s Century yarn V/s West Discom) ; P.No. 41/2018 (M/s Century Denim V/s West Discom) | Not Applicable | 03-Aug-2021 |
|
23 | 23/2018 |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited |
SMP on non-compliance of meterisation of pre dominant Agricultural Consumers | Not Applicable,Regulation 40 of the Madhya Pradesh Electricity Regulatory Commission (Conduct of Business) | 05-Dec-2020 |
|
|
24 | 24/2018 |
1) SUO MOTO PETITON by MPERC |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the matter of period of temporary connections to Agricultural consumers. | Not Applicable | 12-Jul-2020 |
|
25 | 25/2018 |
1) CLP WIND FARMS (INDIA) PVT. LTD. |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 142 of the Electricity Act, 2003 for non-compliance by the Respondent, of the directions passed by MPERC in its Order dated 02.09.2016 in Petition No. 33/ 2016. | Not Applicable | 25-Jan-2019 |
|
26 | 26/2018 |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under section 86(1)(E),61(H) and 62 of EA'2003 for review of rate for procurement of inadvertent flow of electricity from solar projects. | Not Applicable | 11-Oct-2018 |
|
|
27 | 27/2018 |
1) Managing Director, MP Power Management Company Limited |
1) M/s. Adani Green Energy Limited |
Review petition on behalf of MPPMCL under Section 94 and 149 of the Electricity Act read with Order 47 of the Code of Civil Procedure 1908. | Not Applicable | 09-Jan-2019 |
|
28 | 28/2018 |
1) M/s Jhabua Power Limited |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Determination of Final Generation Tariff for 1X600 MW Unit (Phase-I) Coal Based Thermal Power Station at Barela-Gorakhpur, Dist. Seoni, Madhya Pradesh for the control period from FY 2016-17 to FY 2018-19 under Madhya Pradesh Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2015. | Not Applicable | 30-Nov-2018 |
|
29 | 29/2018 |
1) M/s Hind Spinner; 2) M/s Ritspin Synthetics Ltd 3) M/s Wearit Global Ltd; 4) M/s Century Yarn 5) M/s Century Denim |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) SLDC State Load Dispatch Center |
Appeal/Applications under clause 12 of the Balancing and Settlement Code ,2009 in pursuance to the Directions issued by the Hon’ble High Court of Madhya Pradesh , Bench at Indore vide its Order 12.02.2018 passed in Writ Petition 2162 of 2015 (Century Denim V/s State of MP & others), Writ Petition 2159 of 2015 ( M/s Century yarn V/s State of MP & others) , Writ petition no. 2004/2015 of (M/s Ritspin Synthetics Ltd. V/s State of MP & others) ,Writ Petition 1173 of 2016 (Hind Spinner V/s State of MP & others) , Writ petition 2494 of 2015 (Wearit Global Ltd. V/s State of MP & Others. P.No 22/2018 (Hind Spinner V/s West Discom); P.No. 29/2018 (M/s Ritspin Synthetics Ltd V/s West Discom); P.No. 30/2018 (Wearit Global Ltd V/s West Discom); P.No. 40/2018 (M/s Century yarn V/s West Discom) ; P.No. 41/2018 (M/s Century Denim V/s West Discom) | Not Applicable | 03-Aug-2021 |
|
30 | 30/2018 |
1) M/s Wearit Global Ltd; |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited |
Application for early hearing in compliance of Hon'ble High Court, Indore bench order date 01.11.2019 in WP No. 23047/19. | Not Applicable | 03-Aug-2021 |
|
31 | 31/2018 |
1) M P Power Generating Company Limited |
1) Managing Director, MP Power Management Company Limited 2) M P Power Transmission Company Limited |
In the matter of petition for determination of Provisional Generation Tariff of Unit No. 3 & 4 (2X660MW) of Shree Singaji Thermal Power Project (SSTPP) Stage II, Distt. Khandwa, under Section 62 of the Electricity Act, 2003. | Not Applicable | 07-Mar-2019 |
|
32 | 32/2018 |
1) M/s Arya Energy Limited, Raipur 2) M/s. Orient Green Power Co. Ltd. |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the generator and the procurer of electricity regarding the fixed charge/ interest bills raised by the petitioner in terms of the liberty given by the Hon’ble Appellate Tribunal for Electricity in the judgment dated 29.05.2018 in EP No. 2 of 2017 in Appeal No. 338 of 2016. | Not Applicable | 16-Nov-2018 |
|
33 | 33/2018 |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
Determination of True-up of Aggregate Revenue Requirement determined by MPERC for FY 2013-14 based on the true-up petition jointly filed by M.P. Power Management Company Ltd. (MPPMCL), Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Ltd. (East Discom), Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Ltd. (Central Discom) and Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Ltd. (West Discom) as per MPERC (Terms and conditions for determination of tariff for supply and wheeling of Electricity and methods and principles for fixation of charges) Regulations, 2012. | Not Applicable | 30-Nov-2018 |
|
|
34 | 34/2018 |
1) SUO MOTO PETITON by MPERC |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
In the matter of petition under Section 142 of the Electricity Act, 2003 for noncompliance by MPMKVVCL, Bhopal of the directions passed by MPERC, Bhopal | Section 142 of the Electricity Act 2003 | 31-Aug-2018 |
|
35 | 35/2018 |
1) M/s Arya Energy Limited, Raipur 2) M/s. Orient Green Power Co. Ltd. |
1) Managing Director, MP Power Management Company Limited 2) SLDC State Load Dispatch Center |
In the matter of petition under section 86(1)(f) of the Electricity Act, 2003 for adjudication of disputes between the generator and the procurer of electricity regarding the arrears/ interest bills raised by the petitioner in terms of the liberty given by the Hon’ble Appellate Tribunal for Electricity in the judgment dated 29.05.2018 in EP No. 2 of 2017 in Appeal No. 338 of 2016. | Not Applicable | 06-Apr-2021 |
|
36 | 36/2018 |
1) Managing Director, MP Power Management Company Limited |
In the matter of filing of petition under section 86(1)(c) , 61(h) and 62 of the EA,2003, seeking approval for compliance of RPO target on overall (Solar + Non-Solar basis) and approval for excess RPO compliance and carry forward of the same in subsequently years for adjustment against shortfall, if any. | Not Applicable | 31-Aug-2018 |
|
|
37 | 37/2018 |
1) M/s Shri Durga Khandsari Sugar Mills |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) Ministry of New & Renewable Energy |
In the matter of petition filed under 86(1)(e), section 86(1)(f) and section 86(1)(a) read with regulation 10 of MPERC (Cogeneration and Generation of electricity from renewable sources of energy) Regulations,2010 and para 18.15, 18.16, 18.18 and 18.20 of MPERC (Terms and conditions for Intra-State open access in MP) Regulations,2005. | Not Applicable | 27-Nov-2018 |
|
38 | 38/2018 |
1) Shri Narmada Sugar (P) Ltd. |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) Ministry of New & Renewable Energy |
In the matter of petition filed under 86(1)(e), section 86(1)(f) and section 86(1)(a) read with regulation 10 of MPERC (Cogeneration and Generation of electricity from renewable sources of energy) Regulations,2010 and para 18.15, 18.16, 18.18 and 18.20 of MPERC (Terms and conditions for Intra-State open access in MP) Regulations,2005. | Not Applicable | 29-Nov-2018 |
|
39 | 39/2018 |
1) M/s. G I Power Corporation Ltd. |
1) Managing Director, MP Power Management Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of petition seeking permission under Clause 6.2 of MPERC (Cogeneration & Generation of Electricity from Renewable Sources of energy) (Revision-I) Regulation, 2010 amended on 9th November’ 2010 and 30th June’ 2011 for the extension of PP&WA for a period of 5 years (wind farm at Rabadiya Hill Distt – Dewas) | Not Applicable | 15-Jan-2019 |
|
40 | 40/2018 |
1) M/s Hind Spinner; 2) M/s Ritspin Synthetics Ltd 3) M/s Wearit Global Ltd; 4) M/s Century Yarn 5) M/s Century Denim |
Appeal/Applications under clause 12 of the Balancing and Settlement Code ,2009 in pursuance to the Directions issued by the Hon’ble High Court of Madhya Pradesh , Bench at Indore vide its Order 12.02.2018 passed in Writ Petition 2162 of 2015 (Century Denim V/s State of MP & others), Writ Petition 2159 of 2015 ( M/s Century yarn V/s State of MP & others) , Writ petition no. 2004/2015 of (M/s Ritspin Synthetics Ltd. V/s State of MP & others) ,Writ Petition 1173 of 2016 (Hind Spinner V/s State of MP & others) , Writ petition 2494 of 2015 (Wearit Global Ltd. V/s State of MP & Others. P.No 22/2018 (Hind Spinner V/s West Discom); P.No. 29/2018 (M/s Ritspin Synthetics Ltd V/s West Discom); P.No. 30/2018 (Wearit Global Ltd V/s West Discom); P.No. 40/2018 (M/s Century yarn V/s West Discom) ; P.No. 41/2018 (M/s Century Denim V/s West Discom) | Not Applicable | 03-Aug-2021 |
|
|
41 | 41/2018 |
1) M/s Hind Spinner; 2) M/s Ritspin Synthetics Ltd 3) M/s Wearit Global Ltd; 4) M/s Century Yarn 5) M/s Century Denim |
1) MP Pashchim Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) SLDC State Load Dispatch Center |
Appeal/Applications under clause 12 of the Balancing and Settlement Code ,2009 in pursuance to the Directions issued by the Hon’ble High Court of Madhya Pradesh , Bench at Indore vide its Order 12.02.2018 passed in Writ Petition 2162 of 2015 (Century Denim V/s State of MP & others), Writ Petition 2159 of 2015 ( M/s Century yarn V/s State of MP & others) , Writ petition no. 2004/2015 of (M/s Ritspin Synthetics Ltd. V/s State of MP & others) ,Writ Petition 1173 of 2016 (Hind Spinner V/s State of MP & others) , Writ petition 2494 of 2015 (Wearit Global Ltd. V/s State of MP & Others. P.No 22/2018 (Hind Spinner V/s West Discom); P.No. 29/2018 (M/s Ritspin Synthetics Ltd V/s West Discom); P.No. 30/2018 (Wearit Global Ltd V/s West Discom); P.No. 40/2018 (M/s Century yarn V/s West Discom) ; P.No. 41/2018 (M/s Century Denim V/s West Discom) | Not Applicable | 03-Aug-2021 |
|
42 | 42/2018 |
1) M/s Ramnik power & Alloys pvt. Ltd. |
1) SLDC State Load Dispatch Center 2) M/s Mittal Processors (P) Ltd 3) M/s Prism Cement Ltd. 4) M/s UltraTech (Maihar Cement Ltd)., Maihar |
In the matter of petition under Section 86(1)(e) of the Electricity Act, 2003 seeking orders/ directions to be given to the State Load Dispatch Centre (SLDC) Jabalpur to refund the money erroneously charged and collected towards transmission charges, operating and scheduling charges and revising schedule charges. | Not Applicable | 10-Jan-2020 |
|
43 | 43/2018 |
1) M/s Ramnik power & Alloys pvt. Ltd. |
1) MP Poorva Kshetra Vidyut Vitran Company Limited |
In the Matter of petition under section 86(1)(e) of EA, 2003, seeking clarifications /orders/directions to be given to the MP Poorva Kshetra Vidyut Vitaran Co. Ltd. on effective date of implementation of seventh amendment to MPERC (Cogeneration and Generation of electricity from renewable source of energy) Revision-1, Regulations 2010. | Not Applicable | 25-Sep-2018 |
|
44 | 44/2018 |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
In the matter of filing petition seeking amendment in clause 3.4 of chapter 3 "System of Supply and Clarification of Consumers" of MP Electricity Supply Code, 2013 | Not Applicable | 10-Oct-2018 |
|
|
45 | 45/2018 |
1) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
In the matter of filing petition by Central Discom for approval of investment plan of Rs 5762.99 Crore for FY2017-18 to FY2021-22. | Not Applicable | 22-Apr-2021 |
|
|
46 | 46/2018 |
1) Mahakaushal Sugar and Power Industries Ltd., |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under section 86(1)(f) of EA,2003, for adjudication of dispute between the petitioner and respondents, occasioned due to the backtracking and refusal of respondents to enter into a Power Purchase Agreement with the petitioner in accordance/compliance with the state issued guidelines on the subject and also the MPERC Tariff order 2013 relating to power generated from Renewable sources of energy, after having accord "In Principle Approval" to do so. | Not Applicable | 30-Oct-2018 |
|
47 | 47/2018 |
1) Campus Polyplast Pvt. Ltd. |
1) M P Power Transmission Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) Ministry of New & Renewable Energy |
In the matter of Petition under Regulation 9(1) of the MPERC (Conduct of Business) Regulations, 2004 read with regulation 8(40) of the MPERC (Terms and Conditions of Intra-State Open Access in Madhya Pradesh) Regulations, 2005. | Not Applicable | 15-Nov-2018 |
|
48 | 48/2018 |
1) SLDC State Load Dispatch Center |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) M.P Audyogic Kendra Vikas Nigam (Indore) Ltd 5) West Central Railways, Jabalpur 6) Managing Director, MP Power Management Company Limited 7) M P Power Transmission Company Limited 8) Kalptaru Satpura Transco Pvt. Ltd 9) M P Power Generating Company Limited 10) Narmada Hydro-Electric Development Corp. Bhopal 11) Narmada Valley Development Authority, Bhopal 12) M/s Jaiprakash Power Venture Ltd |
In the matter of Levy and collection of Fee and Charges by SLDC, Jabalpur for the year 2019-20 | Not Applicable | 07-Mar-2019 |
|
49 | 49/2018 |
1) M/s Jaiprakash Power Venture Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff of 2 x 250 MW (Phase-I) coal based Thermal Power Station at Bina, District Sagar (M.P.) for FY 2017-18 determined by MP Electricity Regulatory Commission vide Multi Year Tariff Order dated 08th August’ 2016. | Not Applicable | 31-May-2019 |
|
50 | 50/2018 |
1) M P Power Transmission Company Limited |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) M.P Audyogic Kendra Vikas Nigam (Indore) Ltd 4) West Central Railways, Jabalpur |
True-up of Transmission Tariff of MPPTCL Jabalpur determined by M P Electricity Regulatory Commission for FY 2017-18 vide Multi Year Tariff order dated 10th June’ 2016 | Not Applicable | 04-Jan-2020 |
|
51 | 51/2018 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff for Unit No. 1 (600 MW) of 2 x 600 MW sub-critical coal based Anuppur Thermal Power Project at District Anuppur (M.P.) determined by MP Electricity Regulatory Commission for FY 2017-18 vide Order dated 1st December’ 2017. | Not Applicable | 12-Jun-2019 |
|
52 | 52/2018 |
1) M/s Green Infra Wind Energy Ltd |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1)(f) read with Section 86(1)(e) of the Electricity Act, 2003 along with the applicable rules made therein for non-payment towards invoices raised by the petitioner. | Not Applicable | 04-Jan-2021 |
|
53 | 53/2018 |
1) M/s Green Infra Wind Energy Ltd |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under Section 86(1)(f) read with Section 86(1)(e) of the Electricity Act, 2003 along with the applicable rules made therein for non-payment towards invoices raised by the petitioner. | Not Applicable | 04-Jan-2021 |
|
54 | 54/2018 |
1) M/s. Renew Clean Energy Private Limited |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition filed under Section 86(1)(f) , 86(1) (b) of the Electricity Act’2003 and Article 11 of PPA seeking an appropriate mechanism for grant of an appropriate adjustment/ compensation to offset financial/ commercial impact of change in law events on account of the introduction of GST. | Not Applicable | 23-Nov-2019 |
|
55 | 55/2018 |
1) Managing Director, MP Power Management Company Limited 2) MP Madhya Khsetra Vidyut Vitran Compnay Limited 3) MP Pashchim Kshetra Vidyut Vitran Company Limited 4) MP Poorva Kshetra Vidyut Vitran Company Limited |
Determination of True-up of Aggregate Revenue Requirement (ARR) for FY 2014-15 to FY 2017-18 based on the True-up Petitions filed by the Distribution Licensees namely Madhya Pradesh Poorv Kshetra Vidyut Vitaran Company Limited (East DISCOM), Madhya Pradesh Paschim Kshetra Vidyut Vitaran Company Limited (West DISCOM), Madhya Pradesh Madhya Kshetra Vidyut Vitaran Company Limited (Central DISCOM), and M.P. Power Management Company Limited (MPPMCL). | Not Applicable | 24-May-2021 |
|
|
56 | 56/2018 |
1) Managing Director, MP Power Management Company Limited |
In the matter of petition under section 86(1) (e), 61(h) and 62 of Electricity Act, 2003 for review of rate for procurement of inadvertent flow of electricity from solar projects. | Not Applicable | 09-Jan-2019 |
|
|
57 | 57/2018 |
1) MB Power (Madhya Pradesh) Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
True-up of Generation Tariff of Unit No. 2 (600 MW) of 2 x 600 MW sub-critical coal based Anuppur Thermal Power Project at District Anuppur (M.P.) determined by MP Electricity Regulatory Commission for FY 2017-18 vide Order dated 29th November’ 2018. | Not Applicable | 01-Jul-2019 |
|
58 | 58/2018 |
1) MP Poorva Kshetra Vidyut Vitran Company Limited 2) MP Pashchim Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited |
In the matter of petition seeking amendment in Clause 8.37, Clause 9.2, 9.14 and Clause 11.7 of Madhya Pradesh Electricity Supply Code, 2013 {RG-1(i) of 2013. | Not Applicable | 02-Aug-2019 |
|
|
59 | 283/17 and 131 & 231/2018 |
1) M/s Jaiprakash Power Venture Ltd |
1) Managing Director, MP Power Management Company Limited 2) MP Poorva Kshetra Vidyut Vitran Company Limited 3) MP Madhya Khsetra Vidyut Vitran Compnay Limited 4) MP Pashchim Kshetra Vidyut Vitran Company Limited |
In the matter of Judgment dt. 22.03.2024 pronounced by Honble APTEL in Appeal No. 283/2017, 131/2018 and 231/2018 filed by M/s Jaiprakash Power Ventures Ltd. against true-up Orders issued by the Commission | - | 16-Apr-2024 |
|
Copyright © 2024 - MPERC.
Contents Provided, Updated & Maintained By
MPERC, Bhopal (M.P.)
Disclaimer : While every care has been taken to ensure the accuracy of information furnished in this website, MPERC does not accept any responsibility or liability for any damage or loss to any person for the result of any action taken on the basis of this information. However, MPERC shall be obliged if errors/omissions are brought to its notice for carrying out corrections in the next update.